Ouroboros Dual-Track Workflow Design (Revised)

Date: 2026-03-02
Scope: docs/ouroboros/86_peak_probability_model_plan.md and docs/ouroboros/80_implementation_audit.md


1. Goal

Prevent work loss and history contamination while running two parallel tracks, while correcting an invalid starting condition (design commits created on a disposable temporary branch):

  • Track A: open and iterate the 86 plan as a dedicated PR.
  • Track B: finalize 80 only after real-operation behavior is confirmed, then reflect completion and close related Gitea open issues.

2. Constraints and Current Context

  • Current temporary branch is disposable and must not remain the authoritative base.
  • Canonical base line for current work is feature/v3-session-policy-stream.
  • Final integration strategy is to merge the full feature/v3-session-policy-stream line into main after operation-level validation is complete.

3. Approaches Considered

  1. Keep using temporary branch and continue from existing design commits.
  2. Create a clean base from feature/v3-session-policy-stream and move only plan artifacts as one commit (recommended).
  3. Split into two fresh bases (86 and 80 separately) immediately.

Recommendation rationale:

  • Approach 2 removes temporary-branch contamination risk.
  • It preserves clean lineage with a single "official starting point" commit.
  • It keeps downstream split for 86 and 80 straightforward.

4. Approved Branch and PR Topology

  • Long-lived source baseline: feature/v3-session-policy-stream
  • New official base: base/ouroboros-workflow-20260302 (from feature/v3-session-policy-stream)
  • Official base contains only two workflow plan docs squashed into one commit.
  • Track A branch: task/86-peak-probability-plan (from official base)
  • Track B branch: task/80-implementation-audit-closeout (from official base)

PR direction:

  • PR-A (86): task/86-peak-probability-plan -> base/ouroboros-workflow-20260302
  • PR-B (80): task/80-implementation-audit-closeout -> base/ouroboros-workflow-20260302
  • Final integration: feature/v3-session-policy-stream line merged into main

5. Completion Criteria per Track

Track A (86)

  • Open initial PR early with the planning document.
  • Continue iterative concretization in follow-up commits on the same branch.

Track B (80)

  • Do not close based on test-command artifacts alone.
  • Close only when modified behavior is confirmed in real operation.
  • Update 80_implementation_audit.md with:
    • observed behavior changes,
    • confirmation timing,
    • operation-side evidence summary.
  • After 80 real-operation confirmation and doc update, close related Gitea open issues immediately (same phase).
  • Parent issues close only when all child issues are confirmed closed.

6. Loss-Prevention Rules

  • Preserve temporary-branch unmerged changes first (stash or archival commit).
  • Exclude workflow/session-handover.md and docs/ouroboros/86_peak_probability_model_plan.md from official base-seeding commit.
  • Enforce file-scope separation:
    • PR-A should avoid 80 edits.
    • PR-B should avoid 86 edits.
  • Keep commit messages scoped to one track per commit.

7. Merge Strategy Decision

  • For this workflow, prefer merge-based lineage preservation.
  • Because the final promotion unit is the full feature/v3-session-policy-stream stream, avoid unnecessary cherry-pick/rebase-surgery unless a contamination incident occurs.

8. Immediate Next Actions

  1. Seed base/ouroboros-workflow-20260302 from feature/v3-session-policy-stream with one squashed workflow-doc commit.
  2. Verify seed commit file scope contains only two plan docs.
  3. Create and open PR-A for 86.
  4. Complete real-operation confirmation for 80, update audit doc, then close related Gitea issues (children first, then parent).
  5. Merge validated feature/v3-session-policy-stream line into main.