Live Operation Issue Tracking Design

Date: 2026-03-02
Scope: Real-operation confirmation tracking for all open Gitea issues, tied to task/80-implementation-audit-closeout.


1. Goal

Define an issue-by-issue tracking method for real-operation confirmation so that:

  • every open issue is tracked with explicit lifecycle states,
  • parent-child close order is enforced,
  • and final closeout is reflected in 80 audit work without loss.

2. Target Set

  • Coverage target: all current open Gitea issues (318~381, and future open issues during this closeout window).
  • Tracking starts from open set snapshot and stays synced until closeout completion.

3. Tracking Architecture

  • Primary log: direct comments on each issue ticket.
  • Aggregate log: single summary comment on the 80 PR (task/80-implementation-audit-closeout).
  • No separate tracking doc as source of truth during execution.

4. State Model and Criteria

State machine:

  • NOT_STARTED
  • OBSERVING
  • CONFIRMED
  • CLOSED

Rules:

  • CONFIRMED requires one real-operation observation evidence item.
  • CLOSED requires close conditions satisfied and ticket close action executed.
  • Parent issue cannot become CLOSED until all child issues are CLOSED.

5. Issue Comment Template

Each issue update comment uses:

  • Status: <STATE>
  • Observed At: <KST>, <UTC>
  • Environment: live
  • Evidence: <log/query/order-execution identifier>
  • Next: <single next action>

This template is reused for every transition for consistent auditability.


6. Parent-Child Policy

  • Parent issue comment must list child issue IDs.
  • Child issues transition independently.
  • Parent close gate:
    • if any child is not CLOSED, parent remains at most CONFIRMED;
    • when all children are CLOSED, parent can transition to CLOSED and be closed.

7. Operational Loop

  1. Initialize all open issues with NOT_STARTED comment.
  2. Move active issues to OBSERVING when live confirmation begins.
  3. Move to CONFIRMED after one real-operation evidence capture.
  4. Close child issues first, then close parent issue(s).
  5. Update the single 80 PR summary comment whenever issue state changes.
  6. Reflect final confirmed/closed outcomes in docs/ouroboros/80_implementation_audit.md.

8. Evidence and Time Rules

  • Evidence must be replayable/referenceable by identifier (not vague narrative only).
  • Every update includes both KST and UTC timestamps.
  • Use absolute dates (example: 2026-03-02) to avoid ambiguity in session handoff.

9. Completion Conditions

Tracking design is complete when:

  • all open issues are represented in issue comments with valid lifecycle state,
  • parent-child closure constraints are respected,
  • 80 PR summary comment reflects current global status,
  • and final 80 audit document update is ready for closeout commit.